Blue Ghost Lunar Lander on Schedule for September 2023 Moon Mission
A major milestone for the Blue Ghost lunar lander has been reached with the successful completion of the Critical Design Review (CDR). This CDR paves the way for Firefly to begin construction of the Blue Ghost lander, which is scheduled to touch down in the Mare Crisium lunar basin in September of 2023. The lander will carry ten NASA payloads as part of…
Keep reading with a 7-day free trial
Subscribe to The Journal of Space Commerce to keep reading this post and get 7 days of free access to the full post archives.