500-lbf Engine Design Advanced by Frontier Aerospace
Heading Towards Critical Design Review Later This Year
A contract has been received by Frontier Aerospace to advance its 500-lbf engine through Critical Design Review (CDR) in mid-2024.
"This contract validates our approach to engine development and results."
Jim McKinnon, Frontier Aerospace
The 500-lbf engine design has been iterated through internal research and development campaigns to optimize performanc…
Keep reading with a 7-day free trial
Subscribe to The Journal of Space Commerce to keep reading this post and get 7 days of free access to the full post archives.